Shawnee Ridge J3 & C4
Suwanee, Georgia
These two buildings were both Tilt-UP projects.  I did both of these buildings at the same time.  J3 started 30 days prior to C4.  I was able to shift crews directly from one project to the other with no loss of time.  The buildings were about a quarter of a mile apart.  The client for these projects was IDI.

So far I have only been able to locate two pictures of the projects.  When I find more I will scan them in for construction documentation.

This page is still under construction.

This was a Kajima Construction Services Project.
Shawnee Ridge J3
Shawnee Ridge C4